Skip to main content

Power and network failure due to breakdown in building 14 in Golm

Due to an accident in the electrical distribution system in building 14 in Golm (water ingress), the power had to be switched off for the entire building on 13.03.2024 at 2 p.m., which also led to a network failure.

Published

Contact

Online editorial

ZIM